Jim and Kyle got the vertical sticks almost all up today. The majority of the front side is garage doors, so they've just got part of the side wall and the short wall between the doors left to put up. Since the inside of the shop will be 10', there will be lots of fireblocks to put in (code requires them in anything over 8'), so they aren't finished withe the framing yet. But those two guys are fast!
Tuesday, September 01, 2009
Oh, WOW !!!
Subscribe to:
Post Comments (Atom)

No comments:
Post a Comment